TAP142104

Substation

South Carolina · SOUTH CAROLINA ELECTRIC&GAS CO

Max voltage
115
kV

TAP142104 is an electric transmission substation in South Carolina, operated by SOUTH CAROLINA ELECTRIC&GAS CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorSOUTH CAROLINA ELECTRIC&GAS CO
Coordinates33.4616, -81.7017

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2356115 kVSOUTH CAROLINA ELECTRIC&GAS COIN SERVICE7.2 mi
#29298115 kVSOUTH CAROLINA ELECTRIC&GAS COIN SERVICE0.9 mi
#35537115 kVSOUTH CAROLINA ELECTRIC&GAS COIN SERVICE4.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142104, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142104 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN113449Substation-AdjacentGARichmond County230 kV300 MW3.7 yrs75.6
UNKNOWN113450Substation-AdjacentGARichmond County230 kV300 MW3.7 yrs75.6
UNKNOWN113471Substation-AdjacentGARichmond County230 kV300 MW3.7 yrs75.5
UNKNOWN117189Substation-AdjacentSCAiken County230 kV300 MW3.7 yrs75.3
UNKNOWN113466Substation-AdjacentGARichmond County230 kV300 MW3.7 yrs73.9
PEACH ORCHARDSubstation-AdjacentGARichmond County230 kV300 MW3.7 yrs73.9
UNKNOWN121624Substation-AdjacentGARichmond County230 kV300 MW3.7 yrs73.6
GOSHENSubstation-AdjacentGARichmond County230 kV300 MW3.7 yrs73.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP142104 substation, South Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.