RISER151770

Substation

South Carolina

Max voltage
115
kV

RISER151770 is an electric transmission substation in South Carolina. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

Coordinates32.1783, -80.7627

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#27971115 kVIN SERVICE1.2 mi
#30275115 kV0.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of RISER151770, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near RISER151770 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BURTONSubstation-AdjacentSCBeaufort County230 kV300 MW3.7 yrs72.7
SANTEE COOPERSubstation-AdjacentSCBeaufort County230 kV300 MW3.7 yrs71.4
UNKNOWN167524Substation-AdjacentSCJasper County230 kV300 MW3.7 yrs71.3
BOULEVARDSubstation-AdjacentGAChatham County230 kV300 MW3.7 yrs71.2
KRAFT SUBSTATIONSubstation-AdjacentGAChatham County115 kV100 MW3.7 yrs69.8
UNKNOWN170159Substation-AdjacentSCJasper County230 kV300 MW3.7 yrs69.6
JASPERSubstation-AdjacentSCJasper County230 kV300 MW3.7 yrs69.2
UNKNOWN154164Substation-AdjacentSCBeaufort County115 kV100 MW3.7 yrs68.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for RISER151770 substation, South Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.