GOSHEN
SubstationSouth Carolina · GEORGIA POWER CO
GOSHEN is an electric transmission substation in South Carolina, operated by GEORGIA POWER CO. It is classified as high-voltage (230 kv) and connects 11 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #50584 | 230 kV | GEORGIA POWER CO | IN SERVICE | 4.6 mi |
| #24623 | 230 kV | GEORGIA POWER CO | IN SERVICE | 4.2 mi |
| #29969 | 230 kV | GEORGIA POWER CO | IN SERVICE | 3.9 mi |
| #36588 | 230 kV | GEORGIA POWER CO | IN SERVICE | 8.4 mi |
| #49302 | 230 kV | GEORGIA POWER CO | IN SERVICE | 4.3 mi |
| #5966 | 230 kV | GEORGIA POWER CO | IN SERVICE | 23.4 mi |
| #28529 | 230 kV | GEORGIA POWER CO | IN SERVICE | 18.7 mi |
| #25777 | 115 kV | GEORGIA POWER CO | IN SERVICE | 1.6 mi |
| #27618 | 115 kV | GEORGIA POWER CO | IN SERVICE | 2.8 mi |
| #34750 | 115 kV | GEORGIA POWER CO | IN SERVICE | 2.4 mi |
| #50489 | 115 kV | GEORGIA POWER CO | IN SERVICE | 3.9 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of GOSHEN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN113457 | Substation-Adjacent | GA | Richmond County | 230 kV | 300 MW | 3.7 yrs | 75.8 |
| UNKNOWN113450 | Substation-Adjacent | GA | Richmond County | 230 kV | 300 MW | 3.7 yrs | 75.6 |
| UNKNOWN113497 | Substation-Adjacent | GA | Columbia County | 230 kV | 300 MW | 3.7 yrs | 75.6 |
| UNKNOWN113449 | Substation-Adjacent | GA | Richmond County | 230 kV | 300 MW | 3.7 yrs | 75.6 |
| UNKNOWN113471 | Substation-Adjacent | GA | Richmond County | 230 kV | 300 MW | 3.7 yrs | 75.5 |
| UNKNOWN117189 | Substation-Adjacent | SC | Aiken County | 230 kV | 300 MW | 3.7 yrs | 75.3 |
| TAP161836 | Substation-Adjacent | GA | Columbia County | 230 kV | 300 MW | 3.7 yrs | 74.2 |
| PEACH ORCHARD | Substation-Adjacent | GA | Richmond County | 230 kV | 300 MW | 3.7 yrs | 73.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.