ANP BLACKSTONE ENERGY PROJECT
SubstationRhode Island · FITCHBURG GAS AND ELECTRIC LIGHT COMPANY
ANP BLACKSTONE ENERGY PROJECT is an electric transmission substation in Rhode Island, operated by FITCHBURG GAS AND ELECTRIC LIGHT COMPANY. It is classified as high-voltage (345 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #50585 | 345 kV | FITCHBURG GAS AND ELECTRIC LIGHT COMPANY | IN SERVICE | 10.9 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of ANP BLACKSTONE ENERGY PROJECT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| KENT COUNTY | Substation-Adjacent | RI | Kent County | 345 kV | 600 MW | 3.5 yrs | 75.3 |
| ANP BELLINGHAM ENERGY PROJECT | Substation-Adjacent | MA | Norfolk County | 345 kV | 600 MW | 3.5 yrs | 72.9 |
| ANP BLACKSTONE ENERGY PROJECT | Substation-Adjacent | RI | Providence County | 345 kV | 600 MW | 3.5 yrs | 72.9 |
| OCEAN STATE | Substation-Adjacent | RI | Providence County | 345 kV | 600 MW | 3.5 yrs | 72.3 |
| MILLBURY NO. 3 | Substation-Adjacent | MA | Worcester County | 345 kV | 600 MW | 3.5 yrs | 72.3 |
| WALTHAM | Substation-Adjacent | MA | Middlesex County | 230 kV | 300 MW | 3.5 yrs | 70.9 |
| BELLINGHAM COGENERATION FACILITY | Substation-Adjacent | RI | Providence County | 345 kV | 600 MW | 3.5 yrs | 70.6 |
| NORTH CAMBRIDGE | Substation-Adjacent | MA | Suffolk County | 345 kV | 600 MW | 3.5 yrs | 70.6 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.