WILLARD JOHNSON

Substation

Oregon · HOOD RIVER ELECTRIC COOP

Max voltage
115
kV

WILLARD JOHNSON is an electric transmission substation in Oregon, operated by HOOD RIVER ELECTRIC COOP. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorHOOD RIVER ELECTRIC COOP
StateOregon
Coordinates45.6239, -121.5348

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#77601115 kVHOOD RIVER ELECTRIC COOP0.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WILLARD JOHNSON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WILLARD JOHNSON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN209081Substation-AdjacentORHood River County230 kV300 MW1.7 yrs71.7
THE DALLESSubstation-AdjacentWAKlickitat County230 kV300 MW1.7 yrs69.2
Greenfield (WAUTOMA - OSTRANDER)GreenfieldORHood River County500 kV1,000 MW1.7 yrs68.0
Greenfield (BIG EDDY - OSTRANDER)GreenfieldORHood River County500 kV1,000 MW1.7 yrs67.2
TAP205756Substation-AdjacentORHood River County115 kV100 MW1.7 yrs67.0
Greenfield (BIG EDDY - OSTRANDER)GreenfieldORHood River County500 kV1,000 MW1.7 yrs66.2
TAP209080Substation-AdjacentORHood River County115 kV100 MW1.7 yrs66.1
Greenfield (WAUTOMA - OSTRANDER)GreenfieldWAKlickitat County500 kV1,000 MW1.7 yrs65.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WILLARD JOHNSON substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.