WEISER is an electric transmission substation in Oregon, operated by IDAHO POWER CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage115 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorIDAHO POWER CO
StateOregon
Coordinates44.2475, -116.9860

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#70509138 kVIDAHO POWER CO3.3 mi
#70510115 kVIDAHO POWER CO6.3 mi
#75597115 kVIDAHO POWER CO14.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WEISER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WEISER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LANGLEY GULCH POWER PLANTSubstation-AdjacentIDPayette County230 kV300 MW1.7 yrs69.0
ONTARIOSubstation-AdjacentIDPayette County230 kV300 MW1.7 yrs67.1
TAP207369Substation-AdjacentIDGem County230 kV300 MW1.7 yrs64.8
PAYETTESubstation-AdjacentIDPayette County138 kV100 MW1.7 yrs64.6
TAP207364Substation-AdjacentIDPayette County115 kV100 MW1.7 yrs64.5
UNKNOWN207359Substation-AdjacentIDPayette County115 kV100 MW1.7 yrs63.7
TAP207360Substation-AdjacentIDPayette County115 kV100 MW1.7 yrs63.0
TAP207700Substation-AdjacentIDWashington County138 kV100 MW1.7 yrs63.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen