TAP209850

Substation

Oregon · PACIFICORP

Max voltage
115
kV

TAP209850 is an electric transmission substation in Oregon, operated by PACIFICORP. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPACIFICORP
Co-ownerUMATILLA ELECTRIC COOP ASSN
StateOregon
Coordinates45.8037, -119.3722

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67112115 kVPACIFICORP0.4 mi
#78532115 kVUMATILLA ELECTRIC COOP ASSN0.0 mi
#78533115 kVUMATILLA ELECTRIC COOP ASSN0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209850, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209850 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MCNARYSubstation-AdjacentWABenton County500 kV1,000 MW1.7 yrs74.3
CALPINESubstation-AdjacentORMorrow County500 kV1,000 MW1.7 yrs74.2
COYOTE SPRINGS IISubstation-AdjacentWABenton County500 kV1,000 MW1.7 yrs72.6
HORSE HEAVENSubstation-AdjacentWABenton County230 kV300 MW1.7 yrs71.0
UNKNOWN203430Substation-AdjacentORUmatilla County230 kV300 MW1.7 yrs70.4
HIGHLANDSSubstation-AdjacentWABenton County115 kV100 MW1.7 yrs69.7
UNKNOWN201297Substation-AdjacentORMorrow County230 kV300 MW1.7 yrs69.4
TAP203427Substation-AdjacentWABenton County230 kV300 MW1.7 yrs69.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.