TAP209310

Substation

Oregon · PUD NO 1 OF COWLITZ COUNTY

Max voltage
115
kV

TAP209310 is an electric transmission substation in Oregon, operated by PUD NO 1 OF COWLITZ COUNTY. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorPUD NO 1 OF COWLITZ COUNTY
StateOregon
Coordinates46.1404, -122.9971

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#78005115 kVPUD NO 1 OF COWLITZ COUNTY0.1 mi
#78006115 kVPUD NO 1 OF COWLITZ COUNTY0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209310, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209310 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ALLSTONSubstation-AdjacentORColumbia County500 kV1,000 MW1.7 yrs69.5
PORT WESTWARDSubstation-AdjacentWAWahkiakum County230 kV300 MW1.7 yrs68.8
LEXINGTONSubstation-AdjacentWACowlitz County230 kV300 MW1.7 yrs68.7
LONGVIEW1Substation-AdjacentORColumbia County230 kV300 MW1.7 yrs68.4
TAP203174Substation-AdjacentORColumbia County230 kV300 MW1.7 yrs67.7
TAP208766Substation-AdjacentORWashington County115 kV100 MW1.7 yrs66.6
SARASubstation-AdjacentWAClark County115 kV100 MW1.7 yrs66.6
Greenfield (PAUL - ALLSTON)GreenfieldWAWahkiakum County500 kV1,000 MW1.7 yrs66.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP209310 substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.