TAP209306

Substation

Oregon · PUD NO 1 OF COWLITZ COUNTY

Max voltage
115
kV

TAP209306 is an electric transmission substation in Oregon, operated by PUD NO 1 OF COWLITZ COUNTY. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPUD NO 1 OF COWLITZ COUNTY
StateOregon
Coordinates46.1779, -122.9096

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#77997115 kVPUD NO 1 OF COWLITZ COUNTY0.4 mi
#77998115 kVPUD NO 1 OF COWLITZ COUNTY6.9 mi
#77999115 kVPUD NO 1 OF COWLITZ COUNTY2.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP209306, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP209306 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ALLSTONSubstation-AdjacentORColumbia County500 kV1,000 MW1.7 yrs69.5
PORT WESTWARDSubstation-AdjacentWAWahkiakum County230 kV300 MW1.7 yrs68.8
LEXINGTONSubstation-AdjacentWACowlitz County230 kV300 MW1.7 yrs68.7
LONGVIEW1Substation-AdjacentORColumbia County230 kV300 MW1.7 yrs68.4
TAP203174Substation-AdjacentORColumbia County230 kV300 MW1.7 yrs67.7
MAYFIELDSubstation-AdjacentWALewis County240 kV300 MW1.7 yrs66.7
Greenfield (PAUL - ALLSTON)GreenfieldWAWahkiakum County500 kV1,000 MW1.7 yrs66.5
UNION RIDGESubstation-AdjacentWAClark County115 kV100 MW1.7 yrs65.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.