TAP208768

Substation

Oregon · COLUMBIA RIVER PEOPLES UT DIST

Max voltage
115
kV

TAP208768 is an electric transmission substation in Oregon, operated by COLUMBIA RIVER PEOPLES UT DIST. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorCOLUMBIA RIVER PEOPLES UT DIST
StateOregon
Coordinates45.8459, -122.8193

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#76279115 kVCOLUMBIA RIVER PEOPLES UT DIST0.1 mi
#76282115 kVCOLUMBIA RIVER PEOPLES UT DIST0.1 mi
#77125115 kVCOLUMBIA RIVER PEOPLES UT DIST0.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP208768, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP208768 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
KEELERSubstation-AdjacentORWashington County500 kV1,000 MW1.7 yrs78.8
HORIZONSubstation-AdjacentORWashington County230 kV300 MW1.7 yrs74.2
ROSSSubstation-AdjacentWAClark County345 kV600 MW1.7 yrs74.1
GRESHAMSubstation-AdjacentORMultnomah County230 kV300 MW1.7 yrs73.4
RIVERGATESubstation-AdjacentORWashington County230 kV300 MW1.7 yrs73.1
SAINT MARYSSubstation-AdjacentORWashington County230 kV300 MW1.7 yrs72.9
SIFTONSubstation-AdjacentWAClark County230 kV300 MW1.7 yrs72.1
BLUE LAKESubstation-AdjacentORMultnomah County230 kV300 MW1.7 yrs71.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP208768 substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.