TAP208658

Substation

Oregon · MIDSTATE ELECTRIC COOP, INC

Max voltage
115
kV

TAP208658 is an electric transmission substation in Oregon, operated by MIDSTATE ELECTRIC COOP, INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorMIDSTATE ELECTRIC COOP, INC
StateOregon
Coordinates43.6673, -121.5167

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#76960115 kVMIDSTATE ELECTRIC COOP, INC18.9 mi
#76961115 kVMIDSTATE ELECTRIC COOP, INC0.1 mi
#76962115 kVMIDSTATE ELECTRIC COOP, INC0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP208658, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP208658 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PILOT BUTTESubstation-AdjacentORDeschutes County230 kV300 MW1.7 yrs71.6
LAPINESubstation-AdjacentORDeschutes County230 kV300 MW1.7 yrs69.3
UNKNOWN202804Substation-AdjacentORDeschutes County115 kV100 MW1.7 yrs68.1
UNKNOWN202664Substation-AdjacentORDeschutes County115 kV100 MW1.7 yrs66.9
TAP208672Substation-AdjacentORDeschutes County115 kV100 MW1.7 yrs66.8
UNKNOWN208674Substation-AdjacentORDeschutes County115 kV100 MW1.7 yrs66.7
TAP208668Substation-AdjacentORDeschutes County115 kV100 MW1.7 yrs66.6
UNKNOWN202803Substation-AdjacentORDeschutes County115 kV100 MW1.7 yrs66.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP208658 substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.