TAP207603

Substation

Oregon · PUD NO 1 OF BENTON COUNTY

Max voltage
115
kV

TAP207603 is an electric transmission substation in Oregon, operated by PUD NO 1 OF BENTON COUNTY. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPUD NO 1 OF BENTON COUNTY
Co-ownerPUD NO 1 OF KLICKITAT COUNTY
StateOregon
Coordinates45.8664, -119.8520

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#75424115 kVPUD NO 1 OF KLICKITAT COUNTY7.9 mi
#75425115 kVPUD NO 1 OF BENTON COUNTY0.0 mi
#75426115 kVPUD NO 1 OF BENTON COUNTY2.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207603, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207603 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COYOTE SPRINGS IISubstation-AdjacentWABenton County500 kV1,000 MW1.7 yrs72.6
HORSE HEAVENSubstation-AdjacentWABenton County230 kV300 MW1.7 yrs71.0
SLATTSubstation-AdjacentORGilliam County500 kV1,000 MW1.7 yrs70.4
TAP203427Substation-AdjacentWABenton County230 kV300 MW1.7 yrs69.1
Greenfield (MARION - ASHE)GreenfieldWABenton County500 kV1,000 MW1.7 yrs67.9
ARLINGTON WIND POWER PROJECTSubstation-AdjacentORGilliam County230 kV300 MW1.7 yrs67.8
Greenfield (SLATT - ASHE)GreenfieldWABenton County500 kV1,000 MW1.7 yrs67.3
TAP203421Substation-AdjacentORGilliam County230 kV300 MW1.7 yrs67.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP207603 substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.