TAP207186 is an electric transmission substation in Oregon, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Co-ownerPORTLAND GENERAL ELECTRIC CO
StateOregon
Coordinates45.3352, -122.9847

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67402230 kVBONNEVILLE POWER ADMINISTRATION13.4 mi
#73736230 kVBONNEVILLE POWER ADMINISTRATION8.3 mi
#75156115 kVPORTLAND GENERAL ELECTRIC CO3.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207186, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207186 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
KEELERSubstation-AdjacentORWashington County500 kV1,000 MW1.7 yrs78.8
PEARLSubstation-AdjacentORWashington County500 kV1,000 MW1.7 yrs78.1
HORIZONSubstation-AdjacentORWashington County230 kV300 MW1.7 yrs74.2
ROSSSubstation-AdjacentWAClark County345 kV600 MW1.7 yrs74.1
RIVERGATESubstation-AdjacentORWashington County230 kV300 MW1.7 yrs73.1
SAINT MARYSSubstation-AdjacentORWashington County230 kV300 MW1.7 yrs72.9
TAP203160Substation-AdjacentORWashington County230 kV300 MW1.7 yrs72.6
TAP207182Substation-AdjacentORWashington County230 kV300 MW1.7 yrs71.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen