TAP206989
SubstationOregon · PACIFICORP
TAP206989 is an electric transmission substation in Oregon, operated by PACIFICORP. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #74760 | 115 kV | PACIFICORP | IN SERVICE | 2.4 mi |
| #74761 | 115 kV | PACIFICORP | IN SERVICE | 0.0 mi |
| #74762 | 115 kV | PACIFICORP | IN SERVICE | 4.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP206989, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| DIXONVILLE 500KV | Substation-Adjacent | OR | Douglas County | 500 kV | 1,000 MW | 1.7 yrs | 73.1 |
| RESTON | Substation-Adjacent | OR | Douglas County | 230 kV | 300 MW | 1.7 yrs | 68.8 |
| HANNA TAP | Substation-Adjacent | OR | Douglas County | 230 kV | 300 MW | 1.7 yrs | 68.6 |
| UNKNOWN208721 | Substation-Adjacent | OR | Douglas County | 230 kV | 300 MW | 1.7 yrs | 68.5 |
| Greenfield (DIXONVILLE 500KV - ALVEY) | Greenfield | OR | Douglas County | 500 kV | 1,000 MW | 1.7 yrs | 68.3 |
| Greenfield (DIXONVILLE 500KV - ALVEY) | Greenfield | OR | Douglas County | 500 kV | 1,000 MW | 1.7 yrs | 67.9 |
| DIXONVILLE 230KV | Substation-Adjacent | OR | Douglas County | 230 kV | 300 MW | 1.7 yrs | 67.6 |
| UNKNOWN203089 | Substation-Adjacent | OR | Douglas County | 138 kV | 100 MW | 1.7 yrs | 67.0 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen