TAP205825

Substation

Oregon · WASCO ELECTRIC COOP, INC

Max voltage
115
kV

TAP205825 is an electric transmission substation in Oregon, operated by WASCO ELECTRIC COOP, INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorWASCO ELECTRIC COOP, INC
StateOregon
Coordinates44.9102, -120.4418

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#71674115 kVWASCO ELECTRIC COOP, INC14.8 mi
#71675115 kVWASCO ELECTRIC COOP, INC6.8 mi
#71676115 kVWASCO ELECTRIC COOP, INC13.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205825, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205825 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (BUCKLEY - SLATT)GreenfieldORSherman County500 kV1,000 MW1.7 yrs65.4
CONDON WINDSubstation-AdjacentORGilliam County115 kV100 MW1.7 yrs62.6
UNKNOWN208715Substation-AdjacentORGilliam County115 kV100 MW1.7 yrs60.7
CONDONSubstation-AdjacentORGilliam County115 kV100 MW1.7 yrs60.7
FOSSILSubstation-AdjacentORWheeler County115 kV100 MW1.7 yrs58.9
MUDDY RANCHSubstation-AdjacentORWheeler County115 kV100 MW1.7 yrs57.9
Greenfield (JONES CANYON - SANTIAM)GreenfieldORSherman County230 kV300 MW1.7 yrs57.8
ANTELOPESubstation-AdjacentORWasco County115 kV100 MW1.7 yrs57.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP205825 substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.