TAP205346

Substation

Oregon · PACIFICORP

Max voltage
115
kV

TAP205346 is an electric transmission substation in Oregon, operated by PACIFICORP. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPACIFICORP
StateOregon
Coordinates43.2995, -122.5813

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#71311115 kVPACIFICORP38.2 mi
#71312115 kVPACIFICORP0.0 mi
#71314115 kVPACIFICORP4.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205346, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205346 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MERIDIANSubstation-AdjacentORDouglas County500 kV1,000 MW1.7 yrs67.3
UNKNOWN205344Substation-AdjacentORDouglas County115 kV100 MW1.7 yrs62.3
LEMOLO NO 1 HYDROSubstation-AdjacentORDouglas County115 kV100 MW1.7 yrs60.6
TAP205347Substation-AdjacentORDouglas County115 kV100 MW1.7 yrs60.2
FISH CREEKSubstation-AdjacentORDouglas County115 kV100 MW1.7 yrs59.7
LEMOLO POWERPLANT NUMBER 2Substation-AdjacentORDouglas County115 kV100 MW1.7 yrs59.7
CLEARWATER POWERPLANT NUMBER 1Substation-AdjacentORDouglas County115 kV100 MW1.7 yrs59.7
CLEARWATERSubstation-AdjacentORDouglas County115 kV100 MW1.7 yrs57.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP205346 substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.