TAP205307

Substation

Oregon · IDAHO POWER CO

Max voltage
230
kV

TAP205307 is an electric transmission substation in Oregon, operated by IDAHO POWER CO. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorIDAHO POWER CO
StateOregon
Coordinates44.8574, -117.7471

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#72070230 kVIDAHO POWER CO43.1 mi
#72071230 kVIDAHO POWER CO15.6 mi
#72075230 kVIDAHO POWER CO10.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP205307, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP205307 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
QUARTZSubstation-AdjacentORBaker County230 kV300 MW1.7 yrs67.4
UNKNOWN202147Substation-AdjacentORUnion County230 kV300 MW1.7 yrs67.3
TAP205307Substation-AdjacentORBaker County230 kV300 MW1.7 yrs67.3
ELKHORN VALLEY WIND FARMSubstation-AdjacentORUnion County230 kV300 MW1.7 yrs66.7
TAP207374Substation-AdjacentORBaker County115 kV100 MW1.7 yrs64.0
Greenfield (TAP205307 - QUARTZ)GreenfieldORBaker County230 kV300 MW1.7 yrs64.0
UNKNOWN202611Substation-AdjacentORBaker County138 kV100 MW1.7 yrs63.6
Greenfield (UNKNOWN202147 - EL PASO)GreenfieldORUnion County230 kV300 MW1.7 yrs61.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP205307 substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.