TAP203421

Substation

Oregon · BONNEVILLE POWER ADMINISTRATION

Max voltage
230
kV

TAP203421 is an electric transmission substation in Oregon, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Co-ownerPACIFICORP
StateOregon
Coordinates45.7333, -120.0711

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67943230 kVBONNEVILLE POWER ADMINISTRATION12.2 mi
#67944230 kVBONNEVILLE POWER ADMINISTRATION18.2 mi
#74169230 kVPACIFICORP0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP203421, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP203421 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COYOTE SPRINGS IISubstation-AdjacentWABenton County500 kV1,000 MW1.7 yrs72.6
SLATTSubstation-AdjacentORGilliam County500 kV1,000 MW1.7 yrs70.4
TAP209123Substation-AdjacentWAKlickitat County345 kV600 MW1.7 yrs68.5
JUNIPER CANYON I WIND PROJECTSubstation-AdjacentWAKlickitat County230 kV300 MW1.7 yrs67.8
ARLINGTON WIND POWER PROJECTSubstation-AdjacentORGilliam County230 kV300 MW1.7 yrs67.8
UNKNOWN201545Substation-AdjacentORGilliam County230 kV300 MW1.7 yrs67.3
Greenfield (SLATT - ASHE)GreenfieldWABenton County500 kV1,000 MW1.7 yrs67.3
TAP203421Substation-AdjacentORGilliam County230 kV300 MW1.7 yrs67.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP203421 substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.