TAP203382
SubstationOregon · BONNEVILLE POWER ADMINISTRATION
TAP203382 is an electric transmission substation in Oregon, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #67842 | 115 kV | BONNEVILLE POWER ADMINISTRATION | — | 0.3 mi |
| #67843 | 115 kV | BONNEVILLE POWER ADMINISTRATION | — | 34.2 mi |
| #67844 | 115 kV | BONNEVILLE POWER ADMINISTRATION | — | 5.7 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP203382, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TAP203387 | Substation-Adjacent | OR | Linn County | 115 kV | 100 MW | 1.7 yrs | 61.4 |
| OAKRIDGE | Substation-Adjacent | OR | Lane County | 115 kV | 100 MW | 1.7 yrs | 60.8 |
| NORTH BUTTE | Substation-Adjacent | OR | Linn County | 115 kV | 100 MW | 1.7 yrs | 59.2 |
| UNKNOWN206283 | Substation-Adjacent | OR | Linn County | 115 kV | 100 MW | 1.7 yrs | 58.7 |
| BLUE RIVER | Substation-Adjacent | OR | Linn County | 115 kV | 100 MW | 1.7 yrs | 58.5 |
| GREEN PETER | Substation-Adjacent | OR | Linn County | 115 kV | 100 MW | 1.7 yrs | 57.9 |
| CARMEN SMITH | Substation-Adjacent | OR | Linn County | 115 kV | 100 MW | 1.7 yrs | 57.8 |
| COUGAR | Substation-Adjacent | OR | Linn County | 115 kV | 100 MW | 1.7 yrs | 57.4 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen