TAP203379

Substation

Oregon · BONNEVILLE POWER ADMINISTRATION

Max voltage
115
kV

TAP203379 is an electric transmission substation in Oregon, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
StateOregon
Coordinates43.9333, -122.7972

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67827115 kVBONNEVILLE POWER ADMINISTRATION13.4 mi
#67829115 kVBONNEVILLE POWER ADMINISTRATION2.4 mi
#67830115 kVBONNEVILLE POWER ADMINISTRATION0.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP203379, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP203379 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ALVEYSubstation-AdjacentORLane County500 kV1,000 MW1.7 yrs77.3
UNKNOWN202116Substation-AdjacentORLane County230 kV300 MW1.7 yrs74.0
MCKENZIESubstation-AdjacentORLane County230 kV300 MW1.7 yrs72.0
TAP203154Substation-AdjacentORLane County230 kV300 MW1.7 yrs70.3
DIAMOND HILLSubstation-AdjacentORLane County230 kV300 MW1.7 yrs70.1
UNKNOWN207020Substation-AdjacentORLane County132 kV100 MW1.7 yrs69.9
TAP203155Substation-AdjacentORLane County230 kV300 MW1.7 yrs69.7
UNKNOWN207015Substation-AdjacentORLane County115 kV100 MW1.7 yrs69.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP203379 substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.