TAP203274

Substation

Oregon · BONNEVILLE POWER ADMINISTRATION

Max voltage
115
kV

TAP203274 is an electric transmission substation in Oregon, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
StateOregon
Coordinates42.9095, -124.4474

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67678115 kVBONNEVILLE POWER ADMINISTRATIONIN SERVICE0.3 mi
#67679115 kVBONNEVILLE POWER ADMINISTRATIONIN SERVICE10.0 mi
#67680115 kVBONNEVILLE POWER ADMINISTRATION10.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP203274, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP203274 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
COQUILLESubstation-AdjacentORCoos County115 kV100 MW1.7 yrs66.7
MYRTLE POINTSubstation-AdjacentORCoos County115 kV100 MW1.7 yrs64.9
TAP203151Substation-AdjacentORCoos County115 kV100 MW1.7 yrs64.2
MORRISONSubstation-AdjacentORCoos County115 kV100 MW1.7 yrs63.7
Greenfield (FAIRVIEW - ROGUE)GreenfieldORCoos County230 kV300 MW1.7 yrs63.6
BANDONSubstation-AdjacentORCoos County115 kV100 MW1.7 yrs62.6
Greenfield (FAIRVIEW - ROGUE)GreenfieldORCoos County230 kV300 MW1.7 yrs62.3
LANGLOISSubstation-AdjacentORCoos County115 kV100 MW1.7 yrs62.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.