TAP203251

Substation

Oregon · PACIFICORP

Max voltage
115
kV

TAP203251 is an electric transmission substation in Oregon, operated by PACIFICORP. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPACIFICORP
Co-ownerPUD NO 1 OF CLARK COUNTY - (WA)
StateOregon
Coordinates45.9577, -122.3693

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67613115 kVPACIFICORP8.9 mi
#67614115 kVPACIFICORP1.9 mi
#67615115 kVPUD NO 1 OF CLARK COUNTY - (WA)2.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP203251, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP203251 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BPA TROUTDALESubstation-AdjacentORMultnomah County500 kV1,000 MW1.7 yrs78.2
ROSSSubstation-AdjacentWAClark County345 kV600 MW1.7 yrs74.1
RIVERGATESubstation-AdjacentORWashington County230 kV300 MW1.7 yrs73.1
SIFTONSubstation-AdjacentWAClark County230 kV300 MW1.7 yrs72.1
TAP203169Substation-AdjacentORMultnomah County230 kV300 MW1.7 yrs71.1
UNKNOWN202098Substation-AdjacentORWashington County115 kV100 MW1.7 yrs69.8
UNKNOWN202101Substation-AdjacentORMultnomah County115 kV100 MW1.7 yrs69.5
TAP208790Substation-AdjacentORMultnomah County115 kV100 MW1.7 yrs69.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP203251 substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.