TAP203185

Substation

Oregon · BONNEVILLE POWER ADMINISTRATION

Max voltage
115
kV

TAP203185 is an electric transmission substation in Oregon, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
StateOregon
Coordinates45.7226, -121.8240

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67498115 kVBONNEVILLE POWER ADMINISTRATION3.6 mi
#67499115 kVBONNEVILLE POWER ADMINISTRATION1.2 mi
#67500115 kVBONNEVILLE POWER ADMINISTRATION15.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP203185, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP203185 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NORTH BONNEVILLESubstation-AdjacentORHood River County230 kV300 MW1.7 yrs71.9
Greenfield (WAUTOMA - OSTRANDER)GreenfieldORMultnomah County500 kV1,000 MW1.7 yrs68.2
Greenfield (WAUTOMA - OSTRANDER)GreenfieldORHood River County500 kV1,000 MW1.7 yrs68.0
Greenfield (BIG EDDY - OSTRANDER)GreenfieldORHood River County500 kV1,000 MW1.7 yrs67.2
CAPE HORNSubstation-AdjacentORMultnomah County115 kV100 MW1.7 yrs67.0
Greenfield (BIG EDDY - OSTRANDER)GreenfieldORHood River County500 kV1,000 MW1.7 yrs66.2
Greenfield (BIG EDDY - OSTRANDER)GreenfieldORClackamas County500 kV1,000 MW1.7 yrs66.1
Greenfield (WAUTOMA - OSTRANDER)GreenfieldORHood River County500 kV1,000 MW1.7 yrs66.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen