TAP203151

Substation

Oregon · BONNEVILLE POWER ADMINISTRATION

Max voltage
115
kV

TAP203151 is an electric transmission substation in Oregon, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Co-ownerCOOS-CURRY ELECTRIC COOP, INC
StateOregon
Coordinates43.3044, -124.1307

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67690115 kVBONNEVILLE POWER ADMINISTRATIONIN SERVICE5.4 mi
#67691115 kVCOOS-CURRY ELECTRIC COOP, INC0.0 mi
#67693115 kVBONNEVILLE POWER ADMINISTRATIONIN SERVICE14.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP203151, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP203151 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ISTHMUSSubstation-AdjacentORCoos County230 kV300 MW1.7 yrs68.3
COQUILLESubstation-AdjacentORCoos County115 kV100 MW1.7 yrs66.7
STATE ST.Substation-AdjacentORCoos County115 kV100 MW1.7 yrs66.2
HAUSER-CLSubstation-AdjacentORCoos County115 kV100 MW1.7 yrs65.4
GLASGOWSubstation-AdjacentORCoos County115 kV100 MW1.7 yrs65.4
HAUSERSubstation-AdjacentORCoos County115 kV100 MW1.7 yrs65.0
MYRTLE POINTSubstation-AdjacentORCoos County115 kV100 MW1.7 yrs64.9
LOCKHARTSubstation-AdjacentORCoos County115 kV100 MW1.7 yrs64.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen