PONDEROSA

Substation

Oregon · BONNEVILLE POWER ADMINISTRATION

Max voltage
500
kV

PONDEROSA is an electric transmission substation in Oregon, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as extra-high-voltage (500 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage115 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines4

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
Co-ownerPACIFICORP
StateOregon
Coordinates44.2255, -120.9328

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67153500 kVBONNEVILLE POWER ADMINISTRATIONIN SERVICE35.7 mi
#67154500 kVBONNEVILLE POWER ADMINISTRATIONIN SERVICE18.3 mi
#67361230 kVBONNEVILLE POWER ADMINISTRATION21.8 mi
#71690115 kVPACIFICORP6.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PONDEROSA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PONDEROSA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PILOT BUTTESubstation-AdjacentORDeschutes County230 kV300 MW1.7 yrs71.6
REDMONDSubstation-AdjacentORDeschutes County230 kV300 MW1.7 yrs71.4
ROUND BUTTESubstation-AdjacentORJefferson County500 kV1,000 MW1.7 yrs70.2
PONDEROSASubstation-AdjacentORDeschutes County500 kV1,000 MW1.7 yrs69.3
GRIZZLYSubstation-AdjacentORJefferson County500 kV1,000 MW1.7 yrs68.4
UNKNOWN202804Substation-AdjacentORDeschutes County115 kV100 MW1.7 yrs68.1
Greenfield (CELILO - SYLMAR EAST)GreenfieldORJefferson County1000 kV1,000 MW5.8 yrs67.7
Greenfield (PONDEROSA - GRIZZLY)GreenfieldORJefferson County500 kV1,000 MW1.7 yrs67.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PONDEROSA substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.