NORTH HENDRICKSON

Substation

Oregon · PUD NO 1 OF COWLITZ COUNTY

Max voltage
115
kV

NORTH HENDRICKSON is an electric transmission substation in Oregon, operated by PUD NO 1 OF COWLITZ COUNTY. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorPUD NO 1 OF COWLITZ COUNTY
StateOregon
Coordinates46.0211, -122.8535

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67622115 kVPUD NO 1 OF COWLITZ COUNTY8.0 mi
#67628115 kVPUD NO 1 OF COWLITZ COUNTY1.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NORTH HENDRICKSON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NORTH HENDRICKSON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROSSSubstation-AdjacentWAClark County345 kV600 MW1.7 yrs74.1
SIFTONSubstation-AdjacentWAClark County230 kV300 MW1.7 yrs72.1
TAP203169Substation-AdjacentORMultnomah County230 kV300 MW1.7 yrs71.1
ALLSTONSubstation-AdjacentORColumbia County500 kV1,000 MW1.7 yrs69.5
Greenfield (KEELER - ALLSTON)GreenfieldORWashington County500 kV1,000 MW1.7 yrs69.5
UNKNOWN206946Substation-AdjacentORWashington County115 kV100 MW1.7 yrs69.2
Greenfield (KEELER - ALLSTON)GreenfieldORWashington County500 kV1,000 MW1.7 yrs68.9
PORT WESTWARDSubstation-AdjacentWAWahkiakum County230 kV300 MW1.7 yrs68.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NORTH HENDRICKSON substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.