HARVEST WIND PROJECT

Substation

Oregon · PUD NO 1 OF KLICKITAT COUNTY

Max voltage
230
kV

HARVEST WIND PROJECT is an electric transmission substation in Oregon, operated by PUD NO 1 OF KLICKITAT COUNTY. It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines1

Ownership & operation

OperatorPUD NO 1 OF KLICKITAT COUNTY
StateOregon
Coordinates45.7908, -120.2474

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#73145230 kVPUD NO 1 OF KLICKITAT COUNTY0.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HARVEST WIND PROJECT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HARVEST WIND PROJECT substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROCK CREEKSubstation-AdjacentWAKlickitat County500 kV1,000 MW1.7 yrs70.8
SLATTSubstation-AdjacentORGilliam County500 kV1,000 MW1.7 yrs70.4
TAP209123Substation-AdjacentWAKlickitat County345 kV600 MW1.7 yrs68.5
JUNIPER CANYON I WIND PROJECTSubstation-AdjacentWAKlickitat County230 kV300 MW1.7 yrs67.8
ARLINGTON WIND POWER PROJECTSubstation-AdjacentORGilliam County230 kV300 MW1.7 yrs67.8
HAY CANYONSubstation-AdjacentORSherman County345 kV600 MW1.7 yrs67.4
UNKNOWN201545Substation-AdjacentORGilliam County230 kV300 MW1.7 yrs67.3
TAP203421Substation-AdjacentORGilliam County230 kV300 MW1.7 yrs67.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen