FELIDA

Substation

Oregon · PUD NO 1 OF CLARK COUNTY - (WA)

Max voltage
115
kV

FELIDA is an electric transmission substation in Oregon, operated by PUD NO 1 OF CLARK COUNTY - (WA). It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorPUD NO 1 OF CLARK COUNTY - (WA)
StateOregon
Coordinates45.7121, -122.7074

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67601115 kVPUD NO 1 OF CLARK COUNTY - (WA)1.6 mi
#67602115 kVPUD NO 1 OF CLARK COUNTY - (WA)3.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FELIDA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FELIDA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
KEELERSubstation-AdjacentORWashington County500 kV1,000 MW1.7 yrs78.8
BPA TROUTDALESubstation-AdjacentORMultnomah County500 kV1,000 MW1.7 yrs78.2
PEARLSubstation-AdjacentORWashington County500 kV1,000 MW1.7 yrs78.1
MCLOUGHLINSubstation-AdjacentORMultnomah County230 kV300 MW1.7 yrs74.3
HORIZONSubstation-AdjacentORWashington County230 kV300 MW1.7 yrs74.2
ROSSSubstation-AdjacentWAClark County345 kV600 MW1.7 yrs74.1
GRESHAMSubstation-AdjacentORMultnomah County230 kV300 MW1.7 yrs73.4
RIVERGATESubstation-AdjacentORWashington County230 kV300 MW1.7 yrs73.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FELIDA substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.