BUCKLEY

Substation

Oregon · BONNEVILLE POWER ADMINISTRATION

Max voltage
500
kV

BUCKLEY is an electric transmission substation in Oregon, operated by BONNEVILLE POWER ADMINISTRATION. It is classified as extra-high-voltage (500 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage500 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines3

Ownership & operation

OperatorBONNEVILLE POWER ADMINISTRATION
StateOregon
Coordinates45.2309, -120.9005

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#67167500 kVBONNEVILLE POWER ADMINISTRATIONIN SERVICE99.2 mi
#67168500 kVBONNEVILLE POWER ADMINISTRATIONIN SERVICE52.3 mi
#67171500 kVBONNEVILLE POWER ADMINISTRATIONIN SERVICE53.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BUCKLEY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BUCKLEY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CELILOSubstation-AdjacentWAKlickitat County1000 kV1,000 MW5.8 yrs74.3
BUCKLEYSubstation-AdjacentORWasco County500 kV1,000 MW1.7 yrs72.0
BIG EDDYSubstation-AdjacentWAKlickitat County500 kV1,000 MW1.7 yrs70.2
THE DALLESSubstation-AdjacentWAKlickitat County230 kV300 MW1.7 yrs69.2
HAY CANYONSubstation-AdjacentORSherman County345 kV600 MW1.7 yrs67.4
Greenfield (JOHN DAY 2 - BIG EDDY)GreenfieldWAKlickitat County500 kV1,000 MW1.7 yrs67.3
Greenfield (MARION - ASHE)GreenfieldORWasco County500 kV1,000 MW1.7 yrs67.0
TAP205756Substation-AdjacentORHood River County115 kV100 MW1.7 yrs67.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BUCKLEY substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.