ANTELOPE is an electric transmission substation in Oregon, operated by WASCO ELECTRIC COOP, INC. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorWASCO ELECTRIC COOP, INC
StateOregon
Coordinates44.9084, -120.7165

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#71676115 kVWASCO ELECTRIC COOP, INC13.7 mi
#71677115 kVWASCO ELECTRIC COOP, INC28.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ANTELOPE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ANTELOPE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BUCKLEYSubstation-AdjacentORWasco County500 kV1,000 MW1.7 yrs72.0
Greenfield (GRIZZLY - BUCKLEY)GreenfieldORJefferson County500 kV1,000 MW1.7 yrs67.9
Greenfield (JOHN DAY 2 - GRIZZLY)GreenfieldORJefferson County500 kV1,000 MW1.7 yrs67.8
Greenfield (GRIZZLY - BUCKLEY)GreenfieldORJefferson County500 kV1,000 MW1.7 yrs66.4
Greenfield (GRIZZLY - ROUND BUTTE)GreenfieldORJefferson County500 kV1,000 MW1.7 yrs66.3
Greenfield (GRIZZLY - BUCKLEY)GreenfieldORWasco County500 kV1,000 MW1.7 yrs66.3
Greenfield (GRIZZLY - BUCKLEY)GreenfieldORWasco County500 kV1,000 MW1.7 yrs66.2
Greenfield (CELILO - SYLMAR EAST)GreenfieldORWasco County1000 kV1,000 MW5.8 yrs66.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ANTELOPE substation, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.