WEST LANCASTER SUBSTATION

Substation

Ohio · OHIO POWER CO

Max voltage
138
kV

WEST LANCASTER SUBSTATION is an electric transmission substation in Ohio, operated by OHIO POWER CO. It is classified as sub-transmission (138 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines5

Ownership & operation

OperatorOHIO POWER CO
StateOhio
Coordinates39.6982, -82.6233

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#25311138 kVOHIO POWER COIN SERVICE18.7 mi
#28876138 kVOHIO POWER COIN SERVICE19.1 mi
#33265138 kVOHIO POWER COIN SERVICE4.0 mi
#46554138 kVOHIO POWER COIN SERVICE7.2 mi
#60567138 kVOHIO POWER COIN SERVICE9.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WEST LANCASTER SUBSTATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WEST LANCASTER SUBSTATION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
FLATLICKSubstation-AdjacentOHHocking County765 kV1,000 MW3.2 yrs74.8
JUG STREETSubstation-AdjacentOHLicking County345 kV600 MW3.2 yrs74.2
TAP141206Substation-AdjacentOHFairfield County345 kV600 MW3.2 yrs73.4
BIERS RUNSubstation-AdjacentOHPickaway County345 kV600 MW3.2 yrs71.9
MARIONSubstation-AdjacentOHFranklin County138 kV100 MW3.2 yrs71.8
TAP152416Substation-AdjacentOHFranklin County138 kV100 MW3.2 yrs71.1
UNKNOWN113870Substation-AdjacentOHFranklin County138 kV100 MW3.2 yrs71.1
UNKNOWN152397Substation-AdjacentOHFranklin County138 kV100 MW3.2 yrs71.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WEST LANCASTER SUBSTATION substation, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.