Fairfield County, Ohio · PJM

DC Readiness
73.4
Excellent / 100

TAP141206 is a substation-adjacent datacenter candidate site in Fairfield County, Ohio, interconnecting through PJM. It screens at 73.4/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.2 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP141206
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW
LMP zonePJM_AEP
Wholesale LMP$41.99/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth9
Avg queue wait3.2 yrs
Recent queue wait4.4 yrs
Completion rate17%
Withdrawal rate83%

Connectivity

Nearest IXPBresco Broadband Data Center
IXP distance19.2 mi
Fiber providers6
Fiber coverage29.7%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance19.8 mi

Site characteristics

Parcel ownerAMERICAN ELECTRIC POWER CO., INC
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score70/100
Construction cost index88.2 (avg 100)

Location context

Nearest datacenterMeta
DC distance11.0 mi
Nearest rail4.6 mi
Nearest gas pipeline1.5 mi
Nearest fiber route31.7 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.95¢/kWh
Industrial electricity9.71¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$7,551

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power15%
51
Fiber connectivity12%
65
Energy cost10%
84
Water risk8%
88
Natural hazard8%
70
Buildability7%
65
Labor market4%
50
DC cluster4%
95
Land / acreage3%
43
Construction cost3%
77
Gas pipeline2%
95
Tax incentive2%
100
Climate / cooling2%
80

Nearby comparable sites

Other scored datacenter candidate sites in Fairfield County, ranked by DC Readiness.

Sites near TAP141206
SiteTypeVoltageCapacityQueue waitScore
Greenfield (BIXBY - KIRK)Greenfield345 kV600 MW3.2 yrs70.5
MILLERSPORTSubstation-Adjacent138 kV100 MW3.2 yrs69.7
UNKNOWN154527Substation-Adjacent138 kV100 MW3.2 yrs69.6
HARRISONSubstation-Adjacent500 kV1,000 MW3.2 yrs69.5
SOUTH BALTIMORESubstation-Adjacent138 kV100 MW3.2 yrs68.9
UNKNOWN151648Substation-Adjacent138 kV100 MW3.2 yrs68.2
Greenfield (MUSKINGUM RIVER - WEST MILLERS)Greenfield345 kV600 MW3.2 yrs68.1
Greenfield (BIXBY - KIRK)Greenfield345 kV600 MW3.2 yrs66.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP141206, Fairfield County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.