TAP151046

Substation

Ohio · OHIO POWER CO

Max voltage
138
kV

TAP151046 is an electric transmission substation in Ohio, operated by OHIO POWER CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorOHIO POWER CO
StateOhio
Coordinates39.9890, -82.5002

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#32384138 kVOHIO POWER COIN SERVICE0.0 mi
#39785138 kVOHIO POWER COIN SERVICE8.0 mi
#52114138 kVOHIO POWER COIN SERVICE37.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP151046, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP151046 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
JUG STREETSubstation-AdjacentOHLicking County345 kV600 MW3.2 yrs74.2
TAP141206Substation-AdjacentOHFairfield County345 kV600 MW3.2 yrs73.4
Greenfield (JUG STREET - KIRK)GreenfieldOHLicking County345 kV600 MW3.2 yrs70.8
UNKNOWN113876Substation-AdjacentOHFranklin County138 kV100 MW3.2 yrs70.6
UNKNOWN113877Substation-AdjacentOHFranklin County138 kV100 MW3.2 yrs70.5
TAP151653Substation-AdjacentOHFranklin County138 kV100 MW3.2 yrs70.5
Greenfield (BIXBY - KIRK)GreenfieldOHFairfield County345 kV600 MW3.2 yrs70.5
TAYLORSubstation-AdjacentOHFranklin County138 kV100 MW3.2 yrs70.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.