TAP134503 is an electric transmission substation in North Dakota, operated by OTTER TAIL POWER CO. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorOTTER TAIL POWER CO
Coordinates48.5848, -96.6929

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#46199115 kVOTTER TAIL POWER COIN SERVICE8.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP134503, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP134503 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN130320Substation-AdjacentMNMarshall County115 kV100 MW1.4 yrs72.7
UNKNOWN130311Substation-AdjacentMNKittson County115 kV100 MW1.4 yrs71.5
UNKNOWN130181Substation-AdjacentMNKittson County115 kV100 MW1.4 yrs70.8
TAP134502Substation-AdjacentMNKittson County115 kV100 MW1.4 yrs70.3
UNKNOWN130310Substation-AdjacentMNKittson County115 kV100 MW1.4 yrs69.9
TAP133979Substation-AdjacentNDGrand Forks County115 kV100 MW1.4 yrs69.5
UNKNOWN130136Substation-AdjacentMNMarshall County115 kV100 MW1.4 yrs68.5
Greenfield (TAP133979 - TAP133980)GreenfieldMNMarshall County115 kV100 MW1.4 yrs65.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.