TAP133980

Substation

North Dakota · OTTER TAIL POWER CO

Max voltage
115
kV

TAP133980 is an electric transmission substation in North Dakota, operated by OTTER TAIL POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorOTTER TAIL POWER CO
Coordinates48.1954, -96.7824

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4367115 kVOTTER TAIL POWER COIN SERVICE10.9 mi
#29514115 kVOTTER TAIL POWER COIN SERVICE0.0 mi
#46286115 kVIN SERVICE31.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP133980, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP133980 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP134012Substation-AdjacentNDGrand Forks County230 kV300 MW1.4 yrs80.8
UNKNOWN133737Substation-AdjacentNDGrand Forks County230 kV300 MW1.4 yrs78.3
UNKNOWN133738Substation-AdjacentNDGrand Forks County230 kV300 MW1.4 yrs73.7
UNKNOWN133736Substation-AdjacentNDGrand Forks County115 kV100 MW1.4 yrs73.0
UNKNOWN130320Substation-AdjacentMNMarshall County115 kV100 MW1.4 yrs72.7
Greenfield (UNKNOWN133738 - TAP134573)GreenfieldNDGrand Forks County230 kV300 MW1.4 yrs72.3
Greenfield (GRAND FORKS - DRAYTON)GreenfieldNDGrand Forks County230 kV300 MW1.4 yrs71.6
UNKNOWN130311Substation-AdjacentMNKittson County115 kV100 MW1.4 yrs71.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP133980 substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.