WHITEHALL

Substation

New York · NIAGARA MOHAWK POWER CORP.

Max voltage
115
kV

WHITEHALL is an electric transmission substation in New York, operated by NIAGARA MOHAWK POWER CORP.. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

OperatorNIAGARA MOHAWK POWER CORP.
Coordinates43.5114, -73.3597

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#19412115 kVIN SERVICE7.7 mi
#19952115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE6.5 mi
#25157115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE22.5 mi
#51249115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE6.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WHITEHALL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WHITEHALL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WEST RUTLANDSubstation-AdjacentVTRutland County345 kV600 MW3.5 yrs70.6
NORTH RUTLANDSubstation-AdjacentVTRutland County115 kV100 MW3.5 yrs66.4
OZ RutlandGreenfieldVTRutland3.5 yrs64.8
Rutland Landfill (Stafford Hill)BrownfieldVTRutland2 MW64.6
Greenfield (WEST RUTLAND - COOLIDGE)GreenfieldVTRutland County345 kV600 MW3.5 yrs64.4
Greenfield (WEST RUTLAND - COOLIDGE)GreenfieldVTRutland County345 kV600 MW3.5 yrs64.2
UNKNOWN133349Substation-AdjacentVTRutland County115 kV100 MW3.5 yrs63.7
Greenfield (NEW HAVEN - WEST RUTLAND)GreenfieldVTRutland County345 kV600 MW3.5 yrs63.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.