WEST SPRINGFIELD is an electric transmission substation in New York. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates42.0949, -72.5951

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#5219115 kVIN SERVICE2.6 mi
#28564115 kVIN SERVICE2.6 mi
#41607115 kV0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WEST SPRINGFIELD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WEST SPRINGFIELD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
STONY BROOKSubstation-AdjacentMAHampden County345 kV600 MW3.5 yrs72.4
Stony BrookBrownfieldMAHampden422 MW70.4
MANCHESTERSubstation-AdjacentCTCapitol Planning Region345 kV600 MW3.5 yrs69.1
TAP136499Substation-AdjacentCTCapitol Planning Region345 kV600 MW3.5 yrs67.6
NORTH BLOOMFIELDSubstation-AdjacentCTCapitol Planning Region345 kV600 MW3.5 yrs67.6
EAST HARTFORDSubstation-AdjacentCTCapitol Planning Region115 kV100 MW3.5 yrs65.7
LUDLOWSubstation-AdjacentMAHampden County345 kV600 MW3.5 yrs65.6
CARD`Substation-AdjacentCTSoutheastern Connecticut Planning Region345 kV600 MW3.5 yrs65.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.