WADING RIVER GAS TURBINES

Substation

New York · LONG ISLAND POWER AUTHORITY

Max voltage
138
kV

WADING RIVER GAS TURBINES is an electric transmission substation in New York, operated by LONG ISLAND POWER AUTHORITY. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership & operation

OperatorLONG ISLAND POWER AUTHORITY
Coordinates40.9567, -72.8746

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#18666138 kVLONG ISLAND POWER AUTHORITY0.1 mi
#24652138 kVLONG ISLAND POWER AUTHORITYIN SERVICE0.8 mi
#29761138 kVLONG ISLAND POWER AUTHORITYIN SERVICE3.9 mi
#45197138 kVLONG ISLAND POWER AUTHORITY0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WADING RIVER GAS TURBINES, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WADING RIVER GAS TURBINES substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BRIDGEPORT RESCOSubstation-AdjacentCTGreater Bridgeport Planning Region345 kV600 MW3.5 yrs69.7
UNKNOWN133278Substation-AdjacentCTSouth Central Connecticut Planning Region345 kV600 MW3.5 yrs69.4
BRIDGEPORT HARBORSubstation-AdjacentCTGreater Bridgeport Planning Region345 kV600 MW3.5 yrs66.8
MILFORD POWERSubstation-AdjacentCTGreater Bridgeport Planning Region115 kV100 MW3.5 yrs65.6
RICHARD M FLYNNSubstation-AdjacentNYSuffolk County138 kV100 MW3.5 yrs64.6
MILFORD POWER PROJECTSubstation-AdjacentCTGreater Bridgeport Planning Region115 kV100 MW3.5 yrs64.5
TAP140842Substation-AdjacentCTGreater Bridgeport Planning Region115 kV100 MW3.5 yrs64.1
WATER STSubstation-AdjacentCTSouth Central Connecticut Planning Region115 kV100 MW3.5 yrs64.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WADING RIVER GAS TURBINES substation, New York. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.