TURNING STONE

Substation

New York · NIAGARA MOHAWK POWER CORP.

Max voltage
115
kV

TURNING STONE is an electric transmission substation in New York, operated by NIAGARA MOHAWK POWER CORP.. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorNIAGARA MOHAWK POWER CORP.
Coordinates43.1615, -75.5206

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#6373115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE2.6 mi
#50514115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE9.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TURNING STONE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TURNING STONE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MARCYSubstation-AdjacentNYOneida County765 kV1,000 MW3.5 yrs73.1
EDICSubstation-AdjacentNYOneida County345 kV600 MW3.5 yrs68.6
Greenfield (COOPERS CORNER - MARCY)GreenfieldNYOneida County345 kV600 MW3.0 yrs68.4
TERMINALSubstation-AdjacentNYOneida County115 kV100 MW3.5 yrs65.9
WALESVILLESubstation-AdjacentNYOneida County115 kV100 MW3.5 yrs65.2
Greenfield (COOPERS CORNER - MARCY)GreenfieldNYOneida County345 kV600 MW3.0 yrs65.1
SCHUYLERSubstation-AdjacentNYOneida County115 kV100 MW3.5 yrs65.0
DEERFIELDSubstation-AdjacentNYOneida County115 kV100 MW3.5 yrs64.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TURNING STONE substation, New York. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.