TAP161087

Substation

New York · NIAGARA MOHAWK POWER CORP.

Max voltage
115
kV

TAP161087 is an electric transmission substation in New York, operated by NIAGARA MOHAWK POWER CORP.. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorNIAGARA MOHAWK POWER CORP.
Coordinates42.9836, -78.1389

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#17347115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE0.3 mi
#17526115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE0.0 mi
#48028115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE0.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP161087, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP161087 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROCHESTER #80Substation-AdjacentNYMonroe County345 kV600 MW3.5 yrs68.8
SOMERSETSubstation-AdjacentNYGenesee County345 kV600 MW3.5 yrs66.1
UNKNOWN125194Substation-AdjacentNYMonroe County115 kV100 MW3.5 yrs66.0
HIGH SHELDONSubstation-AdjacentNYWyoming County230 kV300 MW3.5 yrs66.0
Greenfield (ROCHESTER #80 - NIAGARA)GreenfieldNYMonroe County345 kV600 MW3.5 yrs65.1
TAP140482Substation-AdjacentNYGenesee County115 kV100 MW3.5 yrs64.1
TAP145541Substation-AdjacentNYLivingston County115 kV100 MW3.5 yrs63.5
MEYERSubstation-AdjacentNYLivingston County230 kV300 MW3.5 yrs63.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP161087 substation, New York. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.