TAP145043

Substation

New York · NEW YORK STATE ELEC & GAS CORP

Max voltage
115
kV

TAP145043 is an electric transmission substation in New York, operated by NEW YORK STATE ELEC & GAS CORP. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorNEW YORK STATE ELEC & GAS CORP
Coordinates42.9432, -76.7741

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16993115 kVNEW YORK STATE ELEC & GAS CORPIN SERVICE11.5 mi
#17064115 kVNEW YORK STATE ELEC & GAS CORPIN SERVICE13.8 mi
#32106115 kVNEW YORK STATE ELEC & GAS CORPIN SERVICE1.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP145043, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP145043 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN144672Substation-AdjacentNYCayuga County115 kV100 MW3.5 yrs65.7
ELBRIDGESubstation-AdjacentNYCayuga County345 kV600 MW3.5 yrs64.6
GREENIDGE GENERATION LLCSubstation-AdjacentNYYates County115 kV100 MW3.5 yrs64.3
UNKNOWN144679Substation-AdjacentNYCayuga County115 kV100 MW3.5 yrs64.1
TAP144671Substation-AdjacentNYCayuga County115 kV100 MW3.5 yrs64.0
Greenfield (PANNELL - CLAY)GreenfieldNYCayuga County345 kV600 MW3.5 yrs63.4
GUARDIAN GLASSSubstation-AdjacentNYSeneca County115 kV100 MW3.5 yrs62.4
Greenfield (PANNELL - CLAY)GreenfieldNYWayne County345 kV600 MW3.5 yrs61.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP145043 substation, New York. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.