TAP141250

Substation

New York · NIAGARA MOHAWK POWER CORP.

Max voltage
115
kV

TAP141250 is an electric transmission substation in New York, operated by NIAGARA MOHAWK POWER CORP.. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorNIAGARA MOHAWK POWER CORP.
Coordinates42.9658, -74.5193

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#28063115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE11.4 mi
#32599115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE7.5 mi
#43107115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE8.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP141250, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP141250 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROTTERDAMSubstation-AdjacentNYSchenectady County230 kV300 MW3.5 yrs67.2
CHURCH STREETSubstation-AdjacentNYSchenectady County115 kV100 MW3.5 yrs63.2
Greenfield (NEW SCOTLAND - EDIC)GreenfieldNYSchenectady County345 kV600 MW3.5 yrs62.7
Greenfield (NEW SCOTLAND - MARCY)GreenfieldNYMontgomery County345 kV600 MW3.5 yrs62.3
INGHAMSSubstation-AdjacentNYFulton County115 kV100 MW3.5 yrs62.2
Greenfield (NEW SCOTLAND - EDIC)GreenfieldNYFulton County345 kV600 MW3.5 yrs62.0
TAP141230Substation-AdjacentNYFulton County115 kV100 MW3.5 yrs61.5
TAP141245Substation-AdjacentNYOtsego County115 kV100 MW3.5 yrs61.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP141250 substation, New York. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.