TAP141245
SubstationNew York · NEW YORK STATE ELEC & GAS CORP
TAP141245 is an electric transmission substation in New York, operated by NEW YORK STATE ELEC & GAS CORP. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #20383 | 115 kV | NEW YORK STATE ELEC & GAS CORP | IN SERVICE | 3.3 mi |
| #29254 | 115 kV | NEW YORK STATE ELEC & GAS CORP | IN SERVICE | 6.1 mi |
| #46722 | 115 kV | NEW YORK STATE ELEC & GAS CORP | IN SERVICE | 0.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP141245, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| MARCY | Substation-Adjacent | NY | Oneida County | 765 kV | 1,000 MW | 3.5 yrs | 73.1 |
| Greenfield (COOPERS CORNER - MARCY) | Greenfield | NY | Oneida County | 345 kV | 600 MW | 3.0 yrs | 68.4 |
| Greenfield (FRASER - EDIC) | Greenfield | NY | Oneida County | 345 kV | 600 MW | 3.0 yrs | 68.3 |
| PORTER | Substation-Adjacent | NY | Oneida County | 230 kV | 300 MW | 3.5 yrs | 67.1 |
| Former Ferdula Landfill | Brownfield | NY | Oneida | — | — | — | 66.7 |
| Greenfield (COOPERS CORNER - MARCY) | Greenfield | NY | Otsego County | 345 kV | 600 MW | 3.0 yrs | 66.4 |
| FRASER | Substation-Adjacent | NY | Otsego County | 345 kV | 600 MW | 3.0 yrs | 66.1 |
| Greenfield (COOPERS CORNER - MARCY) | Greenfield | NY | Otsego County | 345 kV | 600 MW | 3.0 yrs | 65.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP141245 substation, New York. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.