TAP140357

Substation

New York · NIAGARA MOHAWK POWER CORP.

Max voltage
115
kV

TAP140357 is an electric transmission substation in New York, operated by NIAGARA MOHAWK POWER CORP.. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorNIAGARA MOHAWK POWER CORP.
Coordinates43.9923, -75.6028

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#28553115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE14.1 mi
#28556115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE0.0 mi
#31974115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE2.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP140357, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP140357 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN125628Substation-AdjacentNYLewis County230 kV300 MW3.5 yrs65.8
UNKNOWN125576Substation-AdjacentNYJefferson County115 kV100 MW3.5 yrs65.7
REENERGY BLACK RIVERSubstation-AdjacentNYJefferson County115 kV100 MW3.5 yrs65.6
TAP139311Substation-AdjacentNYJefferson County115 kV100 MW3.5 yrs65.1
Greenfield (MASSENA - MARCY)GreenfieldNYLewis County765 kV1,000 MW3.5 yrs64.4
Greenfield (MASSENA - MARCY)GreenfieldNYLewis County765 kV1,000 MW3.5 yrs63.7
Greenfield (MASSENA - MARCY)GreenfieldNYSt. Lawrence County765 kV1,000 MW3.5 yrs63.7
UNKNOWN125581Substation-AdjacentNYJefferson County115 kV100 MW3.5 yrs63.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP140357 substation, New York. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.