TAP139312

Substation

New York · NIAGARA MOHAWK POWER CORP.

Max voltage
115
kV

TAP139312 is an electric transmission substation in New York, operated by NIAGARA MOHAWK POWER CORP.. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorNIAGARA MOHAWK POWER CORP.
Coordinates44.0092, -75.7294

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4279115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE2.6 mi
#7682115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE2.2 mi
#27359115 kVNIAGARA MOHAWK POWER CORP.IN SERVICE6.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP139312, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP139312 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN125628Substation-AdjacentNYLewis County230 kV300 MW3.5 yrs65.8
UNKNOWN125576Substation-AdjacentNYJefferson County115 kV100 MW3.5 yrs65.7
REENERGY BLACK RIVERSubstation-AdjacentNYJefferson County115 kV100 MW3.5 yrs65.6
TAP139311Substation-AdjacentNYJefferson County115 kV100 MW3.5 yrs65.1
Greenfield (MASSENA - MARCY)GreenfieldNYLewis County765 kV1,000 MW3.5 yrs64.4
UNKNOWN125581Substation-AdjacentNYJefferson County115 kV100 MW3.5 yrs63.6
GLEN PARK HYDROELECTRIC PROJECTSubstation-AdjacentNYJefferson County115 kV100 MW3.5 yrs63.0
TAP139306Substation-AdjacentNYJefferson County115 kV100 MW3.5 yrs63.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.