TAP139104

Substation

New York · NEW YORK STATE ELEC & GAS CORP

Max voltage
115
kV

TAP139104 is an electric transmission substation in New York, operated by NEW YORK STATE ELEC & GAS CORP. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorNEW YORK STATE ELEC & GAS CORP
Coordinates42.4455, -76.9190

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#34357115 kVNEW YORK STATE ELEC & GAS CORP0.6 mi
#39477115 kVNEW YORK STATE ELEC & GAS CORPIN SERVICE4.0 mi
#42940115 kVNEW YORK STATE ELEC & GAS CORPIN SERVICE22.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP139104, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP139104 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN171927Substation-AdjacentNYChemung County345 kV600 MW3.0 yrs72.5
UNKNOWN124256Substation-AdjacentNYChemung County230 kV300 MW3.0 yrs68.0
UNKNOWN124262Substation-AdjacentNYChemung County115 kV100 MW3.0 yrs67.1
UNKNOWN124634Substation-AdjacentNYChemung County115 kV100 MW3.0 yrs66.5
TAP141049Substation-AdjacentNYChemung County115 kV100 MW3.0 yrs66.0
Greenfield (WATERCURE - OAKDALE)GreenfieldNYChemung County345 kV600 MW3.0 yrs65.8
UNKNOWN124257Substation-AdjacentNYSteuben County115 kV100 MW3.0 yrs65.7
UNKNOWN124639Substation-AdjacentNYChemung County115 kV100 MW3.0 yrs65.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP139104 substation, New York. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.