TAP136701

Substation

New York · PUBLIC SERVICE CO OF NH

Max voltage
115
kV

TAP136701 is an electric transmission substation in New York, operated by PUBLIC SERVICE CO OF NH. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorPUBLIC SERVICE CO OF NH
Coordinates42.7396, -72.0734

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4167115 kVPUBLIC SERVICE CO OF NHIN SERVICE0.1 mi
#9070115 kVPUBLIC SERVICE CO OF NHIN SERVICE0.2 mi
#59540115 kVIN SERVICE17.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP136701, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP136701 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PRATTS JUNCTIONSubstation-AdjacentMAWorcester County230 kV300 MW3.5 yrs66.2
FITZWILLIAMSubstation-AdjacentNHCheshire County345 kV600 MW3.5 yrs65.8
WACHUSETTSubstation-AdjacentMAWorcester County345 kV600 MW3.5 yrs65.6
AMHERSTSubstation-AdjacentMAFranklin County345 kV600 MW3.5 yrs64.8
PRATTS JUNCTIONSubstation-AdjacentMAWorcester County115 kV100 MW3.5 yrs63.4
TAP139723Substation-AdjacentMAWorcester County115 kV100 MW3.5 yrs62.7
CHOCKSETT RD ENERGY STORAGE PROJECTSubstation-AdjacentMAWorcester County115 kV100 MW3.5 yrs62.2
FITCHBURGSubstation-AdjacentMAWorcester County115 kV100 MW3.5 yrs60.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.