TAP136362

Substation

New York · FITCHBURG GAS AND ELECTRIC LIGHT COMPANY

Max voltage
115
kV

TAP136362 is an electric transmission substation in New York, operated by FITCHBURG GAS AND ELECTRIC LIGHT COMPANY. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorFITCHBURG GAS AND ELECTRIC LIGHT COMPANY
Coordinates42.1530, -71.8816

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#29164115 kVFITCHBURG GAS AND ELECTRIC LIGHT COMPANYIN SERVICE9.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP136362, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP136362 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
KENT COUNTYSubstation-AdjacentRIKent County345 kV600 MW3.5 yrs75.3
ANP BLACKSTONE ENERGY PROJECTSubstation-AdjacentRIProvidence County345 kV600 MW3.5 yrs72.9
MILLBURY NO. 3Substation-AdjacentMAWorcester County345 kV600 MW3.5 yrs72.3
OCEAN STATESubstation-AdjacentRIProvidence County345 kV600 MW3.5 yrs72.3
BELLINGHAM COGENERATION FACILITYSubstation-AdjacentRIProvidence County345 kV600 MW3.5 yrs70.6
JOHNSTON LFG TURBINE PLANTSubstation-AdjacentRIProvidence County115 kV100 MW3.5 yrs68.7
LAKE ROADSubstation-AdjacentCTNortheastern Connecticut Planning Region345 kV600 MW3.5 yrs68.2
WEST MEDWAYSubstation-AdjacentMANorfolk County345 kV600 MW3.5 yrs68.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP136362 substation, New York. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.