SOUTH MEADOW

Substation

New York · CONNECTICUT LIGHT & POWER CO

Max voltage
115
kV

SOUTH MEADOW is an electric transmission substation in New York, operated by CONNECTICUT LIGHT & POWER CO. It is classified as sub-transmission (115 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines6

Ownership & operation

OperatorCONNECTICUT LIGHT & POWER CO
Coordinates41.7514, -72.6523

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#468115 kVCONNECTICUT LIGHT & POWER COIN SERVICE0.1 mi
#10801115 kVCONNECTICUT LIGHT & POWER COIN SERVICE7.7 mi
#27630115 kVCONNECTICUT LIGHT & POWER COIN SERVICE0.4 mi
#37154115 kVCONNECTICUT LIGHT & POWER COIN SERVICE11.7 mi
#38641115 kVCONNECTICUT LIGHT & POWER COIN SERVICE0.4 mi
#40026115 kVCONNECTICUT LIGHT & POWER CO0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SOUTH MEADOW, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SOUTH MEADOW substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NO. WALLSubstation-AdjacentCTSouth Central Connecticut Planning Region345 kV600 MW3.5 yrs70.0
MANCHESTERSubstation-AdjacentCTCapitol Planning Region345 kV600 MW3.5 yrs69.1
NORTH BLOOMFIELDSubstation-AdjacentCTCapitol Planning Region345 kV600 MW3.5 yrs67.6
TAP136499Substation-AdjacentCTCapitol Planning Region345 kV600 MW3.5 yrs67.6
EAST HARTFORDSubstation-AdjacentCTCapitol Planning Region115 kV100 MW3.5 yrs65.7
NOERASubstation-AdjacentCTNaugatuck Valley Planning Region115 kV100 MW3.5 yrs65.7
LUDLOWSubstation-AdjacentMAHampden County345 kV600 MW3.5 yrs65.6
BARBOUR HILLSubstation-AdjacentCTCapitol Planning Region345 kV600 MW3.5 yrs65.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.