SARANAC FACILITY

Substation

New York · NEW YORK STATE ELEC & GAS CORP

Max voltage
115
kV

SARANAC FACILITY is an electric transmission substation in New York, operated by NEW YORK STATE ELEC & GAS CORP. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorNEW YORK STATE ELEC & GAS CORP
Coordinates44.7147, -73.4567

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4531115 kVNEW YORK STATE ELEC & GAS CORPIN SERVICE0.8 mi
#18341115 kVNEW YORK STATE ELEC & GAS CORPIN SERVICE0.8 mi
#27218115 kVNEW YORK STATE ELEC & GAS CORPIN SERVICE0.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SARANAC FACILITY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SARANAC FACILITY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
South Burlington LandfillBrownfieldVTChittenden2 MW68.2
UNKNOWN132786Substation-AdjacentVTChittenden County115 kV100 MW3.5 yrs67.1
DULEYSubstation-AdjacentNYClinton County230 kV300 MW3.5 yrs66.7
QUEEN CITYSubstation-AdjacentVTChittenden County115 kV100 MW3.5 yrs66.6
UNKNOWN127973Substation-AdjacentNYClinton County115 kV100 MW3.5 yrs66.1
TAP136809Substation-AdjacentVTChittenden County115 kV100 MW3.5 yrs66.1
WILLISTONSubstation-AdjacentVTChittenden County115 kV100 MW3.5 yrs66.0
PLATTSBURGHSubstation-AdjacentVTGrand Isle County230 kV300 MW3.5 yrs66.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SARANAC FACILITY substation, New York. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.